Every procedure, each segment, each operate in EPG is demanded to be carried out one particular action adhering to one more, meticulously and cautiously, from substance variety, reformation to manufacturing equipment, from parts heat treatment method to automated assembly, from high quality management to solution inspection and testing and from order working to right after product sales service. With several years’ expertise in this line, we will be trustworthy by our benefits in competitive price, a single-time shipping, prompt response, on-hand engineering assist and excellent following-revenue solutions.Additionally, all our generation techniques are in compliance with ISO9001 standards. If you need any information or samples, you should make contact with us and you will have our shortly reply. Keywords colon Shovel loader comma Wheel Loader comma front loader comma loaEPTfor sale comma wheel loaEPT3ton
Our positive aspects colon
-We generate most of the parts in our personal manufacturing facility comma far better to control the good quality comma less complicated to get parts in the EPT
-Genuine guarantee for good quality colon we will supply components as cost-free inside of guarantee if good quality difficulty
-EPT experiences in this marketplace colon we commenced to exporting loaders from calendar year 2008 interval
Characteristics of this design 3ton loader colon
1 rpar The wheel loaEPTuses XiHu (West Lake) Dis.hu (West Lake) Dis.feng EPT engine with less oil use comma low noise and little emissions period
two rpar EPT and torque converter of 5 ton wheel loaEPTare of good applicability interval
three rpar Optimally made working unit and frames of wheel loaEPTare stronger and much more resilient interval
4 rpar EPT duty unloading EPT program improves the EPT wheel loaEPTperformance interval
five rpar The wheel loaEPTuses very best EPT cylinders comma pumps and valve period of time
Information colon
1 rpar EPT engine comma 130HP comma 6 cylinders comma 4 strokes comma h2o cooling comma turbocharged comma EPT guarantee period ZL50 planetary kind EPT with EPT converter comma 2 EPT and 1 reverse speeds comma very same as 5ton wheel loader comma more powerful for large responsibility period EPT EPT shift interval EPT axles with caliper variety services brake period of time
two rpar The robotically welded two-piece structural body design provides a rugged and reputable basis for the EPT that improves security comma overall performance comma and serviceability period of time A robust articulating hitch method joins the entrance and rear frames bettering toughness interval Increased line routings throughout the hitch joint streamline the production method and enhance trustworthiness and toughness period
three rpar EPT structural parts are all developed by EPT period of time All the elements are substantial top quality welded period The ball blasting and vibration treatment method can launch the welding stress time period UT lparEPT Screening rpar to examine the welding defect period It will sort a lot of tiny pits on the surface area right after blasting and it will improve the paint adhesion period
4 rpar The powerful axle uses a main EPT and two hub EPTs which are linked by two shafts interval The principal EPT uses EPTl EPTs and the hub EPT makes use of planet EPTs interval Dry type caliper brake employs a brake shoe with a brake disc time period It is better for maintenance and radiation period
five rpar The radiating area of the large high quality radiator is included for far better radiation time period The temperature of the motor and the EPT can be managed unEPTthe temperature boundaries period It extends the provider lifestyle equally of the engine and the EPT period of time And it decreases the oil leak of the hoses and in the meantime the support life of hoses is prolonged way too period of time
six rpar Luxurious cabin is geared up both air conditioner and electrical admirer interval Radio with SD card interface is stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd time period The roomy cabin makes certain the relaxed operation and rest atmosphere for the operators period of time
seven rpar One EPT EPTstick control is optional period of time The EPTstick can be moved EPT and again to handle the increase lifting and down period The EPTstick can be moved left and rigEPT to manage the bucket dumping and loading period It is effortless for procedure and the performance is considerably larger than the two EPT control technique time period
8 rpar The steering wheel situation can be a tiny altered period The instrument panel is composed the meter of drinking water temperature comma the meter of oil temperature comma the meter of gas degree comma the meter of air strain and the counter of operating several hours period The switches for lights are combined in the panel too time period
Optonal attachments
-coal bucket
-rock bucket
-quick alter hitch
-wooden grapple
-grass grapple
-pallet fork
Loading and deal
-a single device per 40HQ container or 2 models in a 40HQ and a 20GP containers
-disassembling cabin and bucket
-cabin in a steel frame
-main entire body EPTd into container straight
-fixed with specialist steel ropes
Guarantee and servce colon
1 rpar 1 year guarantee for EPT EPT time period
two rpar All spare areas are obtainable as we produce most of the components in our manufacturing facility time period
3 rpar We can offer complex help through mail comma telephone comma video clip or sending engineers there period
4 rpar EPT operation and maintenance manul and parts list are shipped with the loaders interval
Our goods range colon
We produce wheel loaders with bucket capacity from 1 period8m3 to 3m3 period of time
We also produce excavators from 1 period8ton to 42ton period of time
All EPTs are CE certificated interval
Our manufacturing unit tour colon
We create most of the parts and it is better for good quality control system period And it is easy to get the spare elements from us straight too time period
Specs colon
Basic Info | |
Bucket capacity | 1 period8 m sup3 |
Rated load | 3200 kg |
Operation excess weight | 12440 kg |
Dumping top | 3060 mm |
Dumping reach | 1008 mm |
Breakout force | 97 kN |
Traction power | 100 kN |
Wheel base | 2750 mm |
Whole EPT cycle time | ten period3 s |
Entire bucket lifting time | five period6 s |
Min time period turning radius | 5376 mm |
Overall dimension lparL timesW timesH rpar | 6970 times2450 times3228 mm |
Engine | |
Model | CUMMINS 6BT5 period9-C130 |
Rated EPT | 97 kw |
Rated pace | 2200 rpm |
Max period of time torque | 560 N periodm |
Gas usage | 225 g solkw periodh |
EPT System | |
Gear box variety | planetary EPT change |
EPT pace I | 12 km solh |
EPT pace II | 40 km solh |
Reverse pace | seventeen km solh |
Torque converter type | one stage 4 elements |
Axle type | four-wheel EPT |
Tire measurement | 17 period5-25-12PR |