Solution Profile:
The rubber mixing mill with inventory blender is extensively used in rubber goods producing manufacturing facility to get best mixing dispersion of elements and raw rubber. Coupled with stock blender, these mills will save labor and increase efficiency.
CZPT Mixing mill is utilised for mixing and kneading uncooked rubber, synthetic rubber, thermoplastics or E.V.A.
with chemical substances into even supplies. The even resources can be fed to calender, sizzling presses or other processingmachiner3t for making rubber or plastic items. It adopts dual output reducer, the front and driving roller can be pushed separately with rolling bearing construction, the roller can adopts hollow centre groove roller or drilling hole sleek roller against distinction using scope as mixing, refining or push items and many others.
This machine can be set up inventory blender in accordance to client s request to reduce the labor power, also equipped with protected unit.
Our CZPT Edge:
The rolls are made of chilled solid iron with vanadium and titanium alloys. The roll encounter is challenging and anti-use. To heat up or amazing down, the rolls are either circumferentially drilled or centrally bored so as to make temperature well proportioned on the roll surface.
The device is equipped with a hydraulic relief device. When an emergent incident occurs, just push down the button and the equipment will end quick/y.1t is safe and trustworthy.
The equipment adopts electric powered nip regulating unit that provides effortless procedure.
Bearings for the rolls are double-row ball bearings, which are practical for upkeep and have a long service existence.
The transmission program adopts a hard facing equipment reducer, which has a compacted construction with higher transmission performance, reduced sounds and longer services daily life.
Primary CZPT Parameter:
Product | XK-660 | XK-550B | XK-450 | XK-400 | XK-250 |
(D/L) Roll Dimensions | 660×2130 | 550×1530 | 450×1200 | 400×1000 | 250×620 |
Production | one hundred sixty~170Kg/once | 50~60Kg/when | 30~50Kg/after | twenty five~35Kg/once | ten~15Kg/as soon as |
Motor Electrical power(KW) | 220KW | ninety/110KW | 55KW | 45/37KW | eighteen.5KW |
Line Speed(M/Min) | 34.2M | 28.6M | 21.8M | 19.3M | 15.5M |
Front Roll RPM | 16.five | sixteen | 15.four | 15.four | 19.eight |
Gear Ration | forty seven/ Dual Output | forty seven.five/Twin Output | 50 | 50 | 50 |
Roll Radio | one: 1.24 | one: 1.22 | one: 1.27 | one: 1.27 | one: 1.10 |
Weight KG | 49800 | 18500/25000 | 11800 | 7500 | 3300 |
Temp. Control | Steam/Cool drinking water | ||||
Emergency Cease | 2 foot stage on 4 sets of press buttons | ||||
Container Volume | 55.5m³ | 23m³ | 16m³ | 12m³ | 10m³ |
Dimension(L*W*H)mm | 6200×3350×2670 | 5365×1946×2193 | 4558×1665×2015 | 4001×1500×1870 | 3220×1500×1290 |
Transmission | Low sound equipment box |
CZPT Details
CZPT Customers Visit Manufacturing facility:
FQA-Problems of client worry:
About machine efficiency quality
1. Q: How to assure the good quality of outsourcing areas?
A: Very first decision more than 2 suppler by tender, There are rigid system and procedure for inspecting outsourcing areas. And there are outsourcing inspectors, after inspection, experienced merchandise, labeling and storage. Not experienced, return.
2. Q: Which manufacturer of electric powered portion?
A: Use globe CZPT brands, Siemens, Omron, CZPT, Schneider, ABB
Buyer can specify the brand.
three. Q: How to handle the quality?
A: There are inspectors for inspecting equipment good quality and performance, right after assembly, device run repeatedly for at the very least twelve hours at one particular time, Whole managing time should be not significantly less than forty eight several hours.
About set up
1. Q: When the manual engineer arrive at customer’s manufacturing facility?
A: If want installation on web site, engineer will arrive at manufacturing facility inside of one 7 days right after machine arrived at manufacturing facility.
About soon after-sales service
1. Q: What is the guarantee time?
A: 2 years right after machine arrived at manufacturing facility
2. Q: How to resolve the problem?
A: In one particular hour following acquiring customer’ issue, notify the answer way, there are three techniques for various conditions. one, Which can be solved by mobile phone or Email, it will be solved in two hrs. 2. Which can be solved by Remote Management, it will be solved in four hours(device is equipped by Distant Community Management Issue). 3. Which need to have resolve it on site, engineer arrive at factory inside one 7 days(in the two a long time warranty date, engineer has the visa any time of the region exactly where the m
Get in touch with:
Tel:-532-86~thirteen 0571 88828 138581177783233
Fax:-532-86~thirteen 0571 88828 138581177783233
Cell:-178-5427-5661